 information with proper presentation of the route alternatives, not only in "bar form"! 
 Clear  plans  clear messages, not just the cost! 
 discussion comes later. 
 
 The information in the 90 years he did not have enough evidence. 
 
 to text in the GEA (Saturday, 26 February 2011), page 6:  narrowing it to the streets  
 With a cover line up as we now know as the planning, will be the morning by 5 of the clock noise just so loud, he comes only from above, and in any case, noise and exhaust still in the valley! 
 answer I already know: it will drive electric cars and the gasoline engine will consume less!  
Saturday, February 26, 2011
Monday, February 21, 2011
Blog Monica Roccaforte
 press release vom14.08.09 of Ernst Reinhard Beck MdB 
   
Albaufstieg: planning law quickly reactivate
 
"With all the great joy of the long-awaited start of construction of the disk summit tunnel may continue the B 312 in Liechtenstein are not ignored."
 
Lichtenstein (p) "Set up under the former SPD-Green government tilted planning law for the Albaufstieg in Lichtenstein has to be reactivated as soon as possible," about the CDU Bundestag member Ernst-Reinhard Beck, and Lichtenstein's mayor Helmut Knorr this week were talking agree. ". The continuation of B 312 in Liechtenstein must never be ignored"
 
"With all the great joy of the long-awaited start of construction of the disk summit tunnel," said Beck, Knorr insisted on progress of the plans "go it must! "But the foundation is laid, because Beck has already sought the Tübingen Regional Council several times to resume the planning.
 
However, it is out of the regional board, the light Steiner would have to quickly do their homework: define, therefore, on a route. Beck holds for all parties along the guidelines for noise relief: It should not endanger the Echazquelle still a possible future light rail are excluded. By the year 2015, the preliminary plans are complete, Beck warns of agreement. Because it is undisputed, the new Federal Transport Infrastructure Plan.
 
One only has to look, then you can always find talk a bit about our B 312 
  
Albaufstieg: planning law quickly reactivate
"With all the great joy of the long-awaited start of construction of the disk summit tunnel may continue the B 312 in Liechtenstein are not ignored."
Lichtenstein (p) "Set up under the former SPD-Green government tilted planning law for the Albaufstieg in Lichtenstein has to be reactivated as soon as possible," about the CDU Bundestag member Ernst-Reinhard Beck, and Lichtenstein's mayor Helmut Knorr this week were talking agree. ". The continuation of B 312 in Liechtenstein must never be ignored"
"With all the great joy of the long-awaited start of construction of the disk summit tunnel," said Beck, Knorr insisted on progress of the plans "go it must! "But the foundation is laid, because Beck has already sought the Tübingen Regional Council several times to resume the planning.
However, it is out of the regional board, the light Steiner would have to quickly do their homework: define, therefore, on a route. Beck holds for all parties along the guidelines for noise relief: It should not endanger the Echazquelle still a possible future light rail are excluded. By the year 2015, the preliminary plans are complete, Beck warns of agreement. Because it is undisputed, the new Federal Transport Infrastructure Plan.
One only has to look, then you can always find talk a bit about our B 312
Sunday, February 20, 2011
Car From Movie Illegal Tender
 who already knows the B 313? Specifications 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
B 313
 
all or only speak of the B 312
   
The Interstate 313 branches off from Plochingen on the main road 10, then crosses the highway at Wendlingen 8, Nürtingen in the B 297 and combined with the federal highway in Metzingen 312th Together with this, and the federal highway 28, they lead to Reutlingen. There, the road branches off 28 direction from Tübingen and the B 313 through the Echaz Valley up to Engstingen. there branches off the main road 312 and B 313 continues across the Swabian Alb. Gammertingen between Sigmaringen and where they crossed the Danube, it runs together with the Federal Strasse 32 The bypass Meßkirch it has in common with the federal highway 311, but then diverted to the south, through Stockach, and ends by flowing into Espasingen in the road 34th
  
   
  
B 313
all or only speak of the B 312
The Interstate 313 branches off from Plochingen on the main road 10, then crosses the highway at Wendlingen 8, Nürtingen in the B 297 and combined with the federal highway in Metzingen 312th Together with this, and the federal highway 28, they lead to Reutlingen. There, the road branches off 28 direction from Tübingen and the B 313 through the Echaz Valley up to Engstingen. there branches off the main road 312 and B 313 continues across the Swabian Alb. Gammertingen between Sigmaringen and where they crossed the Danube, it runs together with the Federal Strasse 32 The bypass Meßkirch it has in common with the federal highway 311, but then diverted to the south, through Stockach, and ends by flowing into Espasingen in the road 34th
Friday, February 18, 2011
Gas After Food Poisoning Recover
 a bit dated, but good to know! 
history
 
The federal highway B 312 is an important regional development axis between the main centers of Stuttgart - Reutlingen - the Swabian Alb and Upper Swabia dar. on to the broken line is a major Albaufstieg. This axis is already a historical basis.
out in Reutlingen, the B 312 through the city. A traffic load up to 65,000 vehicles per 24 hours and an enormous burden of noise and pollutants can be reported here. The first consideration for a bypass of Reutlingen go to the mid-1960s back. The objective of the planning was to improve the traffic situation and of course the discharge through the village of Reutlingen of heavy through traffic. In particular, the relief of the main thoroughfare, Karl Road " und der Reutlinger Oststadt vom immer größer werdenden Schleichverkehr war das Ziel der Verkehrsplaner.
In enger Abstimmung und im Auftrag der Straßenbauverwaltung Baden-Württemberg hat die Stadt Reutlingen in den Jahren 1993 bis 1997 ein Bebauungsplanverfahren für die “Umgehungsstraße Scheibengipfeltunnel“ durchgeführt. Das Baurecht für dieses vordringliche Bundesstraßenprojekt wurde zunächst über einen Bebauungsplan der Städte Reutlingen und Eningen geschaffen. Die Gemeinderatsgremien beider Kommunen haben am 17. Juni 1997 den Bebauungsplan mit überwältigender Mehrheit als Satzung beschlossen. Nachdem dieser im Normenkontrollverfahren beim VGH überprüft wurde erlangte the development plan "bypass disk Summit on 22 May 2000 final legal force.
By changing the tunnel Directive (RABT) and the associated increase in demands on tunnel safety was subsequently (in addition to the actual road tunnel) an escape or rescue tunnel scheduled. On this occasion, the ventilation design was optimized and modified. Due to changes in the security policy for the tunnel began in December 2006 initiated a supplementary plan approval process, which was the zoning decisions of 30.06.2008 and 09.12.2008 to be completed. In February 2009, the measure in the economic stimulus package the federal government recorded and started in August 2009 with the construction of the measure.
 
road
 
The bypass Reutlingen as part of the B 312 travels around the core city of Reutlingen in the East - it is in the south, near the South Station, to the existing B312-pass connected Pfullingen and in the north at the so-called Efeuknoten height associated freely with the existing federal highway B 28 / B 312 Reutlingen, Metzingen. The ring road brings a significant reduction (3 km instead of 5 km) of the future 312-B streets. Along the heavily loaded road through it is after start of the disk summit tunnel to a substantial reduction of noise and air pollutants come from and avoid the congestion-plagued road users in the future, the passage of more than 20 traffic signals.
The new bypass is 3.1 km long. The projected traffic volume in 2020 is approximately 20,000 vehicles per day. Today's heavy vehicle share is about 8 percent.
The road cross section for the new road is a special section SQ 11.0 with 8.0 m paved roads and gravel on both sides banquets.
is the smallest radius of the main route R = 450 m (south) and then goes into the on-ramps to the south. The largest Slope is in the range of undercutting the existing B 312 at 5%. It is then reduced to around 3% before the south entrance and go in 0.8% slope on inside the tunnel. The majority of the new bypass is performed with 2.5% slope. The course will be developed as class I.. The construction of the road meets the RStO 2001, line 3 and has a total thickness of 70 cm.
  
  
Source: Unit 47.1 / Government of Tübingen / Reutlingen B312 ring road - disc Summit Tunnel 
  
history
The federal highway B 312 is an important regional development axis between the main centers of Stuttgart - Reutlingen - the Swabian Alb and Upper Swabia dar. on to the broken line is a major Albaufstieg. This axis is already a historical basis.
out in Reutlingen, the B 312 through the city. A traffic load up to 65,000 vehicles per 24 hours and an enormous burden of noise and pollutants can be reported here. The first consideration for a bypass of Reutlingen go to the mid-1960s back. The objective of the planning was to improve the traffic situation and of course the discharge through the village of Reutlingen of heavy through traffic. In particular, the relief of the main thoroughfare, Karl Road " und der Reutlinger Oststadt vom immer größer werdenden Schleichverkehr war das Ziel der Verkehrsplaner.
In enger Abstimmung und im Auftrag der Straßenbauverwaltung Baden-Württemberg hat die Stadt Reutlingen in den Jahren 1993 bis 1997 ein Bebauungsplanverfahren für die “Umgehungsstraße Scheibengipfeltunnel“ durchgeführt. Das Baurecht für dieses vordringliche Bundesstraßenprojekt wurde zunächst über einen Bebauungsplan der Städte Reutlingen und Eningen geschaffen. Die Gemeinderatsgremien beider Kommunen haben am 17. Juni 1997 den Bebauungsplan mit überwältigender Mehrheit als Satzung beschlossen. Nachdem dieser im Normenkontrollverfahren beim VGH überprüft wurde erlangte the development plan "bypass disk Summit on 22 May 2000 final legal force.
By changing the tunnel Directive (RABT) and the associated increase in demands on tunnel safety was subsequently (in addition to the actual road tunnel) an escape or rescue tunnel scheduled. On this occasion, the ventilation design was optimized and modified. Due to changes in the security policy for the tunnel began in December 2006 initiated a supplementary plan approval process, which was the zoning decisions of 30.06.2008 and 09.12.2008 to be completed. In February 2009, the measure in the economic stimulus package the federal government recorded and started in August 2009 with the construction of the measure.
road
The bypass Reutlingen as part of the B 312 travels around the core city of Reutlingen in the East - it is in the south, near the South Station, to the existing B312-pass connected Pfullingen and in the north at the so-called Efeuknoten height associated freely with the existing federal highway B 28 / B 312 Reutlingen, Metzingen. The ring road brings a significant reduction (3 km instead of 5 km) of the future 312-B streets. Along the heavily loaded road through it is after start of the disk summit tunnel to a substantial reduction of noise and air pollutants come from and avoid the congestion-plagued road users in the future, the passage of more than 20 traffic signals.
The new bypass is 3.1 km long. The projected traffic volume in 2020 is approximately 20,000 vehicles per day. Today's heavy vehicle share is about 8 percent.
The road cross section for the new road is a special section SQ 11.0 with 8.0 m paved roads and gravel on both sides banquets.
is the smallest radius of the main route R = 450 m (south) and then goes into the on-ramps to the south. The largest Slope is in the range of undercutting the existing B 312 at 5%. It is then reduced to around 3% before the south entrance and go in 0.8% slope on inside the tunnel. The majority of the new bypass is performed with 2.5% slope. The course will be developed as class I.. The construction of the road meets the RStO 2001, line 3 and has a total thickness of 70 cm.
Source: Unit 47.1 / Government of Tübingen / Reutlingen B312 ring road - disc Summit Tunnel
Thursday, February 17, 2011
Best Middle Range A/v
 What is a citizens' initiative? 
citizen initiative
   
 
B. denotes the (usually) partisan group of people who pursue public interests and common goals, usually related to a single project. In Germany, there are thousands of citizens' initiatives, which are mostly active in local hot spots especially for environmental protection. In Germany were the first citizens' initiatives in the late 1960s.
 
unconventional behavior
 
Political protest behavior to attract the manner of implementing special public and political attention. Certain (social, economic, environmental) problems are only in modern democracies schwer bzw. nur langsam politisch vermitteln und lösen. Daher versuchen politisch aktive Gruppen (z.B. Bürgerinitiativen, Greenpeace), durch spektakuläre, über die Medien verbreitete gewaltfreie Aktionen (z.B. Sitzblockaden) oder durch Aktionen, die Gewalt gegen Sachen beinhalten (z.B. Befreiung von Tieren aus Versuchslaboren), für ihr Anliegen Interesse und öffentliche Resonanz zu schaffen, um es politisch durchzusetzen.
  
Quelle: Schubert, Klaus/Martina Klein: Das Politiklexikon. 4., aktual. Aufl. Bonn: Dietz 2006.  
    
citizen initiative
B. denotes the (usually) partisan group of people who pursue public interests and common goals, usually related to a single project. In Germany, there are thousands of citizens' initiatives, which are mostly active in local hot spots especially for environmental protection. In Germany were the first citizens' initiatives in the late 1960s.
unconventional behavior
Political protest behavior to attract the manner of implementing special public and political attention. Certain (social, economic, environmental) problems are only in modern democracies schwer bzw. nur langsam politisch vermitteln und lösen. Daher versuchen politisch aktive Gruppen (z.B. Bürgerinitiativen, Greenpeace), durch spektakuläre, über die Medien verbreitete gewaltfreie Aktionen (z.B. Sitzblockaden) oder durch Aktionen, die Gewalt gegen Sachen beinhalten (z.B. Befreiung von Tieren aus Versuchslaboren), für ihr Anliegen Interesse und öffentliche Resonanz zu schaffen, um es politisch durchzusetzen.
Quelle: Schubert, Klaus/Martina Klein: Das Politiklexikon. 4., aktual. Aufl. Bonn: Dietz 2006.
Tuesday, February 15, 2011
Shostak Vocabulary Answers Level E
 parties for election 
B 312: Röhm will sich der Mehrheit anschließen
Aussage the GEA on Monday, February 14, 2011
   
   
   
   
  
B 312: Röhm will sich der Mehrheit anschließen
Aussage the GEA on Monday, February 14, 2011
  Who is the majority?  
   Citizens? The "people"?  
   The local council!  
   This has already decided in 1997 for the variant 7 c!  
   The RP has decided otherwise!  
   If we find a majority, then what happens?  
   Karle - that's oifach severally et!    
 Sunday, February 13, 2011
Pay For Hours Of Community Service
ad Street photography 2010 
Nothing is more difficult than on ordinary roads take extra-ordinary images. Candid photographs in public places to make that are really good, was the biggest challenge there is in photography, says Nick Turpin , among others, has photographed campaigns for IBM and many cover photos for major newspapers. (From: Street photography now, Thames & Hudson, London 2010, p. 234)
   
   
   
  Last summer I was riding the bike to the airport. Going away, was there any desire in the game, I just had this overwhelming desire to find out if you could actually see from the airport to Bratislava - you can, as I found out on the top floor of the parking house 4. After the first hour aircraft photographed during the approach, against the backdrop of Hainburger mountains, I watched on the way back to my bike a business lady who casually strolled to her car. She seemed to have all the time, however, I had to react quickly in order to accurately to get below the advertisement.  
  
   
  
Nothing is more difficult than on ordinary roads take extra-ordinary images. Candid photographs in public places to make that are really good, was the biggest challenge there is in photography, says Nick Turpin , among others, has photographed campaigns for IBM and many cover photos for major newspapers. (From: Street photography now, Thames & Hudson, London 2010, p. 234)
|    |  
| Vienna airport / Flughafen Wien-Schwechat: Park view deck, 2010 | 
Saturday, February 12, 2011
Australian Wildlife Rescue Games Online
 SUMMARY 
With the 150th Blog post I want to quit the information on my part.
 
I hope to see many interested in the blog, forward the address and continue to respond with comments or through email, which I will then sign.
 
cover line:
Yes, but only if it is extended! Then, to designate as 1c is!
Yes, if it is assured that the water (boiler source in the valley which supplies the Albwasserversorgung XIV) is not in danger!
No, because the entire Truck traffic will not disappear from the entire valley!
Yes, if the regional light rail without problems - or next to it - can be built!
Yes, if the cost is not calculated then gallop to it!
 
No, if the "caves in the valley" (comparison city hall building in the center) on the risk and cost increase would be!
No, when, as the current planning sketches! Only a short tunnel!
No, if the houses would take the B 312 damage!
No, if the Echazquelle, der Neubrunnen, die Sitterequelle und der Joggelesbrunnen in Gefahr sind!
Nein, wenn der örtliche Handel und die Gastronomie auf der Strecke bliebe!
Nein, wenn die Regionalstadtbahn nicht gebaut würde und die Idee der Bahnhofsfreunde Honau, die Zahnradbahn wieder zum Leben zu erwecken, nicht zu realisieren wäre!
  
Ich verstehe nicht, dass man als Vergleich Varianten herangezogen hat, die von den Kosten her Illusionen sind, z.B.: Variante 7 c (Zellertal); Variante 5 a und 5 b (Reißenbachtalquerung) und die „Albvereinsvariante“
 
The variant with me promised to take in the comparison has been made.
It has the name Lippentaltrasse (modified variant 3).
 
I recall the blog from November 26, 2010
 
..... for your mail of 09.09.2009 and the ideas expressed I thank very warmly.
The alternative route in the West was already, albeit in a modified form repeated a theme. We are out in the further discussion have to elaborate.
You will then have the opportunity, your position darzulegen und
zu erläutern. Ich halte eine Trassenabwägung erst dann für sinnvoll, wenn alle entscheidungserheblichen Fakten fachlich aufbereitet sind. Vorher möchte ich mich dazu nicht äußern und bitte dafür um Verständnis.
  
Diesen Text erhielt ich am 16.September 2009
    
    
Ich erinnere noch einmal : BLOG vom 5.Oktober 2009.....
  
Eine neue Linienführung muß sein: Ab Hortense, in großem Bogen durch einen Einschnitt ins Lippental, durch einen kurzen Basistunnel unter dem Sättele und dem Wackerstein hindurch, a connection to the L 382, \u200b\u200bthe existing chair crate manufacture. Up (possibly three-track development after the tunnel) to the Ruoffseck. On the Swabian Alb on Ruoffseck could split the street and in different route.
• the existing L 230 (some expansion) to the roundabout on the Traifelberg ...
• at Genkingen Undingen and over (possibly new) on the B 313 at today's industrial area Haid (former Barracks) and in the direction Sigmaringen / Bodensee, no longer possible - to be created out / - golf course.
on the Alb plateau and the descent to Pfullingen could at least part of the existing Streets and roads are so not sealed too much scenery and a balance is created or rehabilitated to agricultural land.
 
..... and how I did this route:
 
The idea of \u200b\u200bthe "new Albaufstieg" long dormant in me. In the early 70's when I graduated from the Homeland Security Force "5412" as Stuffz a military exercise entrusted with the task seriously, the road from Metzingen to Trochtelfingen hedge, I had this idea that I was released today fascinates and never .
 
until 1975 that I was through immigration "Lichtsteiner Bürger“.
  
Schon unter der Ära von Bürgermeister Braun war ich strickt dagegen, daß die Eisenbahn stillgelegt und sang und klanglos herausgerissen wird.
Damals habe ich mich mit ihm öffentlich gestritten und vehement gefordert, die Haltestellen in Unterhausen (z.B. Verlegung des Haltestelle Spinnerei - auf Höhe der Stettenstraße hinter der Tankstelle Sättele) neu anzulegen, damit die Bahn von den Benutzern (Wohngebiet Nord-Ost) besser angenommen wird.
  
Danke an Alle - für Euer Mitwirken!
    
    
    
    
    
      
  
With the 150th Blog post I want to quit the information on my part.
I hope to see many interested in the blog, forward the address and continue to respond with comments or through email, which I will then sign.
cover line:
Yes, but only if it is extended! Then, to designate as 1c is!
Yes, if it is assured that the water (boiler source in the valley which supplies the Albwasserversorgung XIV) is not in danger!
No, because the entire Truck traffic will not disappear from the entire valley!
Yes, if the regional light rail without problems - or next to it - can be built!
Yes, if the cost is not calculated then gallop to it!
No, if the "caves in the valley" (comparison city hall building in the center) on the risk and cost increase would be!
No, when, as the current planning sketches! Only a short tunnel!
No, if the houses would take the B 312 damage!
No, if the Echazquelle, der Neubrunnen, die Sitterequelle und der Joggelesbrunnen in Gefahr sind!
Nein, wenn der örtliche Handel und die Gastronomie auf der Strecke bliebe!
Nein, wenn die Regionalstadtbahn nicht gebaut würde und die Idee der Bahnhofsfreunde Honau, die Zahnradbahn wieder zum Leben zu erwecken, nicht zu realisieren wäre!
Ich verstehe nicht, dass man als Vergleich Varianten herangezogen hat, die von den Kosten her Illusionen sind, z.B.: Variante 7 c (Zellertal); Variante 5 a und 5 b (Reißenbachtalquerung) und die „Albvereinsvariante“
The variant with me promised to take in the comparison has been made.
It has the name Lippentaltrasse (modified variant 3).
I recall the blog from November 26, 2010
..... for your mail of 09.09.2009 and the ideas expressed I thank very warmly.
The alternative route in the West was already, albeit in a modified form repeated a theme. We are out in the further discussion have to elaborate.
You will then have the opportunity, your position darzulegen und
zu erläutern. Ich halte eine Trassenabwägung erst dann für sinnvoll, wenn alle entscheidungserheblichen Fakten fachlich aufbereitet sind. Vorher möchte ich mich dazu nicht äußern und bitte dafür um Verständnis.
Diesen Text erhielt ich am 16.September 2009
Ich erinnere noch einmal : BLOG vom 5.Oktober 2009.....
Eine neue Linienführung muß sein: Ab Hortense, in großem Bogen durch einen Einschnitt ins Lippental, durch einen kurzen Basistunnel unter dem Sättele und dem Wackerstein hindurch, a connection to the L 382, \u200b\u200bthe existing chair crate manufacture. Up (possibly three-track development after the tunnel) to the Ruoffseck. On the Swabian Alb on Ruoffseck could split the street and in different route.
• the existing L 230 (some expansion) to the roundabout on the Traifelberg ...
• at Genkingen Undingen and over (possibly new) on the B 313 at today's industrial area Haid (former Barracks) and in the direction Sigmaringen / Bodensee, no longer possible - to be created out / - golf course.
on the Alb plateau and the descent to Pfullingen could at least part of the existing Streets and roads are so not sealed too much scenery and a balance is created or rehabilitated to agricultural land.
..... and how I did this route:
The idea of \u200b\u200bthe "new Albaufstieg" long dormant in me. In the early 70's when I graduated from the Homeland Security Force "5412" as Stuffz a military exercise entrusted with the task seriously, the road from Metzingen to Trochtelfingen hedge, I had this idea that I was released today fascinates and never .
until 1975 that I was through immigration "Lichtsteiner Bürger“.
Schon unter der Ära von Bürgermeister Braun war ich strickt dagegen, daß die Eisenbahn stillgelegt und sang und klanglos herausgerissen wird.
Damals habe ich mich mit ihm öffentlich gestritten und vehement gefordert, die Haltestellen in Unterhausen (z.B. Verlegung des Haltestelle Spinnerei - auf Höhe der Stettenstraße hinter der Tankstelle Sättele) neu anzulegen, damit die Bahn von den Benutzern (Wohngebiet Nord-Ost) besser angenommen wird.
Danke an Alle - für Euer Mitwirken!
Friday, February 11, 2011
Graduation Card Quotes
 illusion? Dream? Wait and see! 
  
 
 
 
 
 
 
 
 
 
 
 
 
sod XX.XX.XXXX
Albaufstieg B 312 and regional rail Neckar-Alb
"I would like to have it!" 
  
sod XX.XX.XXXX
Albaufstieg B 312 and regional rail Neckar-Alb
"I would like to have it!"
Thursday, February 10, 2011
Cool Chritian Phrases
 entrance - the district Untershausen 
Here a roundabout are planned!
and the tunnel should begin shortly! 
  
Here a roundabout are planned!
and the tunnel should begin shortly!
Wednesday, February 9, 2011
Dishlex Global 300 Fuse
 Traifelberg tunnel at the variant cover "
Where is there room for regional light rail? Also tunnel solution?
The railway line must be placed at the roundabout and deeper, so that no barriers are needed. 
  
Where is there room for regional light rail? Also tunnel solution?
The railway line must be placed at the roundabout and deeper, so that no barriers are needed.
Knee Is Itchy After Arthroscopic Surgery
 9.2.: In memoriam T. Bernhard 
80 years ago today, was born Thomas Bernhard. Even before 8 clock early in front of the castle theater people in the queue for tomorrow's public rehearsal of "simply complicated" want to get hold of tickets. All events at the Bernhard-piece in the Academy Theater is sold out
scene change. Tonight has Gartenbaukino Erwin Wagenhofer feature film debut "Black Brown White" Premiere
   
   
.  
 
   
 
   
 
   
 
   
 
   
 
   
   
    
  
80 years ago today, was born Thomas Bernhard. Even before 8 clock early in front of the castle theater people in the queue for tomorrow's public rehearsal of "simply complicated" want to get hold of tickets. All events at the Bernhard-piece in the Academy Theater is sold out
scene change. Tonight has Gartenbaukino Erwin Wagenhofer feature film debut "Black Brown White" Premiere
.
|    |  
| 1st, before the Burgtheater | 
|    |  
| 1st, before the Burgtheater | 
|    |  
| 1st, Schottengasse | 
|    |  
| 1st, carbon market | 
|    |  
| 1st, Stallburggasse | 
|    |  
| 1st, Parkring | 
|    |  
| 1, Rabensteig | 
Tuesday, February 8, 2011
Panasonic Sdr-s150 Webcam Driver
 supporters of chair climbing variant 
today Had a heating engineer in the house; w ohnhaft in carbon Stetten!
 
My question: How you drive if you need to quickly Reutlingen?
 
Answer: ! "If I go over the chair if the industrial area after Betzingen must I go even beyond the Gönningen walks!"
 
I am confirmed!
 
What says this to us?
 
I muss schnell von A nach B kommen; da machen die wenigen KM mehr nichts aus!
  
Ich gebe es ja zu, dass dies die jetzige Situation ist.
Aber wenn Deckel dann die längere Variante (1 c), damit mehr Lichtensteiner Bürger etwas davon haben.
  
Staus werden wir dann immer noch haben; der Quellverkehr ist enorm und die Fahrzeuge, die von der Holzelfinger Steige kommen, sind dann immer noch da.
Wo ist das Problem mit unseren Staus auf der Wilhelmstrasse? Nach dem Ortsschild läuft's doch.
Die von Holzelfingen kommenden fahren an der Echazapotheke rechts ab, dann wird der Kastanienweg, die Kaiserstraße, Charlotte Street and the Scheffelstraße used to turn "faster" in the B 312 can. This, in turn, the backlog is known to us in the morning, almost to manchesmal Honau. 
  
today Had a heating engineer in the house; w ohnhaft in carbon Stetten!
My question: How you drive if you need to quickly Reutlingen?
Answer: ! "If I go over the chair if the industrial area after Betzingen must I go even beyond the Gönningen walks!"
I am confirmed!
What says this to us?
I muss schnell von A nach B kommen; da machen die wenigen KM mehr nichts aus!
Ich gebe es ja zu, dass dies die jetzige Situation ist.
Aber wenn Deckel dann die längere Variante (1 c), damit mehr Lichtensteiner Bürger etwas davon haben.
Staus werden wir dann immer noch haben; der Quellverkehr ist enorm und die Fahrzeuge, die von der Holzelfinger Steige kommen, sind dann immer noch da.
Wo ist das Problem mit unseren Staus auf der Wilhelmstrasse? Nach dem Ortsschild läuft's doch.
Die von Holzelfingen kommenden fahren an der Echazapotheke rechts ab, dann wird der Kastanienweg, die Kaiserstraße, Charlotte Street and the Scheffelstraße used to turn "faster" in the B 312 can. This, in turn, the backlog is known to us in the morning, almost to manchesmal Honau.
Monday, February 7, 2011
Why Is My Female Silver Dollar Changing Color
 representation mining technique - with rescue tunnel 
This design is flat, due to recent legislation, a costly affair!
 
source. Info Sheet B 29 Schwäbisch Gmünd 
  
This design is flat, due to recent legislation, a costly affair!
source. Info Sheet B 29 Schwäbisch Gmünd
Sunday, February 6, 2011
Protein Drink Chest Pain
 Lippentaltrasse (modified route 3) 
This could look like the mountain rise in Lippental called for weeks ago in a comment, I only noticed this today
apology..
Those who do not? be the problem is that all this takes place on Pfullinger district;
Pfullingen is far away. 've Never thought of St.Florianprinzip, but to the people who live in the back Echaz Valley. 
  
This could look like the mountain rise in Lippental called for weeks ago in a comment, I only noticed this today
apology..
Those who do not? be the problem is that all this takes place on Pfullinger district;
Pfullingen is far away. 've Never thought of St.Florianprinzip, but to the people who live in the back Echaz Valley.
Saturday, February 5, 2011
Knock Off Hobo International Wallets
 Ahlsberger alone! 
     The Ahlsberger would appreciate it if the> option would be 3 \u0026lt;. Rest would come.  
And would also be in the western city then becomes very quiet.
The services must be maintained as an escape route.
through a barrier (black Bar) would make clear the lock. 
  
And would also be in the western city then becomes very quiet.
The services must be maintained as an escape route.
through a barrier (black Bar) would make clear the lock.
Friday, February 4, 2011
Hunter Douglas Cordless Duette Repair
 soundproofing Betr. Genkingen in Variant 3 
   
  
There are no problems! The track is laid down (between the red bars), and even the Genkinger no noise problem any more. The sun Buhler come with this version quickly to Reutlingen and even faster in the capital - because the disk summit tunnel then long since completed . 
  
There are no problems! The track is laid down (between the red bars), and even the Genkinger no noise problem any more. The sun Buhler come with this version quickly to Reutlingen and even faster in the capital - because the disk summit tunnel then long since completed .
Thursday, February 3, 2011
Mozzarella Curds Poutine
 "crossing" 2.Ranke (curve) 
     Shown here is the cog railway line, that is, the expected light rail line in gray  eingezeichnet.   
Ich kann mir nicht vorstellen, wie hier die Albaufstiegstrasse in die vorhandene B 312 eingefügt werden soll.
Aber lassen wir uns doch einmal überraschen!.
Der "Sommer" wird es uns zeigen.  
    
Ich kann mir nicht vorstellen, wie hier die Albaufstiegstrasse in die vorhandene B 312 eingefügt werden soll.
Aber lassen wir uns doch einmal überraschen!.
Der "Sommer" wird es uns zeigen.
How Long Does It Take For An Haemotoma To Go
 My Personal Best 2010/1 
    
     
    
   
   
   beginning of the 20th Century, too, settled on some of Venice Au Prater businesses. After the Second World War, only the Ferris wheel and the road south to the exhibition part of the destroyed Wurstelprater were rebuilt. The area of \u200b\u200bVenice took over Au  die Stadt Wien, die  hier einen Park mit Sportanlagen und Kinderspielplätzen errichtete.         
      
      
      
     Hinter dem Media-Tower (Bildmitte) wird 2010 am Donaukanal ein Hotel (Architekt: Jean Nouvel) errichtet. Die Kuppel der Urania-Sternwarte wirkt dagegen vergleichsweise winzig. Rechts dahinter ist das Bundesamtsgebäude Radetzkystraße zu erkennen und der Kirchturm der Pfarre St. Othmar in Erdberg. 2010 gelangte auch das IBM-Gebäude (links) in the possession of the Raiffeisen-Holding NÖ-Wien, whose real estate the high-rise skyline on the Danube channel dominate.   
   
   
   
   2008, opened in place of the former railway station Wien Nord station in Vienna Prater, the new star. Shortly before the start of the Football Championship took place in the wake of the U2-renewal of bulkhead ring to the Ernst-Happel-Stadion, the opening of the U2-Praterstern. Subsequently the western forecourt of the Prater Stern has been redesigned. Now, all tram and bus stops parallel to the new station. Leafy lattice walls and a 3,800 m 2       large shed roof to protect passengers from wind and weather.   
   
   
   
   Two of the six Vienna flak towers - a turret and the one pictured command tower - standing in the huge park of the Augarten. The monstrous anti-aircraft gun towers made of reinforced concrete, during the Second World War of slave labor to protect the city built and served as bomb shelters.   
   
   
   
   campaigned under the slogan of the Government (de facto from 2001 to 2010 alone, ruling Social Democratic Party) for a referendum in February 2010. Four of the five questions were answered mostly "yes": the introduction of all-day schools, Metro-night service on weekends, mandatory "fighting dogs" driver's license, Reintroduction of caretaker in public housing. Only the proposed levying a congestion charge was not a person in the voting majority.   
   
   
   
   At the beginning of 2010 began the demolition work on the 35 year old OPEC-building . Vienna since 1965 headquarters of the Organization of Petroleum Exporting Countries, which was founded in 1960 in Baghdad. The new OPEC headquarters are located in the Wipplingerstrasse. On 21 12. In 1975, a terrorist-led command stormed Listeners of the Venezuela "Carlos" an OPEC meeting at the Dr.-Karl-Lueger-Ring. 70 people were taken as a hostage, three people were killed.   
   
   
  
  
  
   
   No idea why this man on Ash Wednesday got into the icy Danube channel water - my research brought to a reference to a "fountain jumping" somewhere in Germany, which could go back to an old penance. On Ash Wednesday is carnival time in our part of the past and for Christians, then begins the 46-day fast.       
   
   
   
   in June 2010 in the Danube City broke ground for the DC Tower 1 (architect Dominique Perrault), which should reach a height of 220 meters. When the construction of this 60-storey skyscraper completed in 2013 , it will surpass the current tallest building in Austria clearly: The Millennium Tower (architect: Peichl, Podrecca, Weber) measures, including roof structure 202 m.   
   
   
   
   the occasion of the U2-renewal for another 5.3 kilometers from the stadium to Aspernstrasse was on the six new stations second October 2010 celebrated extensively. Since then, the eastern city on the Danube from the city center in about 20 minutes publicly available.   
   
   
   
 
 
   
   the occasion of the 18th World AIDS Conference in July 2010 in Vienna, the Parliament with a huge solidarity loop for HIV-infected people and AIDS sufferers decorated. Model for the "Red Ribbon" was that yellow ribbon, in connection with the kidnapping of became U.S. citizens in Tehran carried in 1980.   
   
   
   
   looks since 1992 "Picasso's eye" (artist: Robert Adrian X) from the facade of the substation on the Danube island Handelskai direction Kaisermühlen.   
   
   
   
   The highest walk-in wooden tower in Europe not only offers a good overview of the progress on the construction site of main railway station - from the 67 m high "Bahnorama" you have also a magnificent view over Vienna   
.
   
   
   on the exposed hills of bare rock, which was later renamed Leopold mountain, Father d ' Aviano on 12 9. In 1683 The presence of the relief army celebrated a historic open-air mass. After the successful defense against the Turks, the chapel was Leopold and has subsequently expanded to the church.   
   
   
   
   Over time, the city residents, the social control of the space in front of their own door lost. Although car drivers are in big cities in the minority, the car is the defining element in the streets.   
      
      
      
     Laut Sozialbericht 2010 besitzen 10 Prozent der Österreicher 61 Prozent aller Immobilien. Seit dem Jahr 2000 hat sich die Zahl der Sozialhilfebezieher in Wien mehr als verdoppelt.          
      
      
      
     Die Fahrgäste der Wiener Linien werden per Lautsprecherdurchsage aufgefordert,  Bettlern nichts zu geben. In einer Gesellschaft, in der "Geiz geil" ist und Armut ein Vergehen, soll niemand ein schlechtes Gewissen haben müssen, wenn Bettler weggejagt werden.      
      
      
      
     Straßenfotografien erzählen keine vollständigen Geschichten, dadurch bleibt der Fantasie der Betrachter Spielraum für eigene Interpretationen.              
      
      
      
   During the worst economic downturn of the postwar period, the national debt to 70 percent of gross domestic product has grown. At the end of the Kreisky era were the debt of our country's "only" 38% of GDP. The interest on our national debt (2010: EUR 195 billion) now consume a tenth of all tax revenues. For a comprehensive administrative and tax reform, Finance Minister Josef Pröll and could struggle through the red-black government team in the fall of 2010 are not anyway.   
   
   
   
   Maria Vassilakou, the top candidate of the Greens, was 2010 Vice-Mayor of the red green city government and City Councilor Michael Häupl for transport, urban planning, climate change and energy. For many, the first occurrence of red-green in Austria, a surprise.   
   
   
   
   The Vienna-election in 2010 the FPÖ was able to double its vote to the municipal council elections in 2005, almost. Strache, top candidate came to 25.77 percent of the vote. The proclaimed by him "battle for Vienna" was, despite a gain of 14 council seats clearly in favor of long-time Mayor of Vienna.     
   
   
   
   After the departure John Hahn came to Brussels State Secretary Christine Marek family for the first time as a top candidate for the Vienna ÖVP parliamentary and municipal elections. The ÖAAB politician wanted "black pepper for the red" to be, but had less than 14% of the vote to accept a historic low of the ÖVP.   
   
   
       
     
   
         
            
      
      
    
        
 
 
   
   
   
   
In the monochrome facade of the 75 m high Sofitel Vienna St. Stephen's Cathedral (architect Jean Nouvel, built in 2010), reflecting the Media Tower by Hans Hollein. The ceiling is a work of media artist Pipilotti Rist.
The showroom of a traditional watch shops in the vicinity of the clock museum adjacent to the Gothic choir of the church at the court. Also in the "cafe metropolis" Vienna, the trend is to a quick coffee to go "watch. How well the old coffeehouse literati would comment on this phenomenon?
   
   
   
     Das bronzene Reiterdenkmal erinnert an Feldmarschall Schwarzenberg, der in der Völkerschlacht bei Leipzig Oberbefehlshaber der verbündeten Streitkräfte gegen Napoleon I. war. In der Kanalisation, direkt unter dem Schwarzenbergplatz, wo heute der Wienfluss und die U-Bahnlinie U4 verlaufen, befand sich einst ein legendärer Obdachlosen-Unterschlupf namens Zwingburg.         
      
      
      
   Part of the  Mölkerbastei is preserved as a relic of the mighty walls of Vienna until today. The dismantling of the military long ago became meaningless fixing began in 1858 as part of the ring road construction. In Pasqualati house, Ludwig van Beethoven lived.     
   
   
   
 
   
     An der zeitlosen Plakatwerbung, die viel Zeitgeist in den öffentlichen Raum transportiert, kommt nahezu jeder vorbei: Die Reichweite von Großplakaten liegt in Wien bei über 90 Prozent. Plakate sind das klassische Massenmedium für Außenwerbung.         
      
      
      
  
  
      
  
   
      
        
          
    
    many details that are visible on these photos will one day be gone forever from our city. Perhaps it is the seemingly insignificant little things, today, hardly anyone aware, however, to look at these photos later evoke great memories.    
 |    |  
| second , Venice Au, 2010 | 
|      |   
| Blick über den Donaukanal (1., Franz-Josefs-Kai), 2010 | 
|    |  
| 2nd, Stephan's, 2010 | 
|    |  
| 2nd, Augarten (Flak Tower), 2010 | 
|    |  
| 1, Franz-Josefs-Kai, 2010 | 
|    |  
| 2nd, Software Group, 2010 | 
|    |  
| 3rd, Hundertwasser Promenade (Danube Canal), 2010 | 
|    |  
| was 22, Carl-Aubé Promenade, 2010 | 
|    |  
| 22, Spittelergasse, 2010 | 
|    |  
| 22, Spittelergasse, 2010 | 
|    |  
| 1st, Dr. -Karl-Renner-Ring (Parliament), 2010 | 
|    |  
| 22, Danube Island / Handelskai, 2010 | 
|    |  
| 10th, railway station construction site (4, Wiedner Gürtel) 2010 | 
.
|    |  
| 21, Floridsdorfer bridge, 2010 | 
|    |  
| 10th, Favoritenstrasse, 2010 | 
|      |   
| 1., Wollzeile, 2010 | 
|      |   
| 1., Schwedenplatz, 2010 | 
|      |   
| 22., Wagramer Straße, 2010 | 
|    |  
| 2nd, Software Group / Tabor Road, 2010 | 
|    |  
| 1, Franz-Josefs-Kai, 2010 | 
|    |  
| 10, Laxenburg Street, 2010 | 
|    |  
| 22, Kagraner Place, 2010 | 
|    |  
| 11, Geiselbergstraße, 2010 | 
     Bei den Wien-Wahlen 2010 erreichte die SPÖ 44,34% der abgegebenen Stimmen und verlor damit ihre absolute Mandatsmehrheit. Der seit 1994 amtierende Wiener Bürgermeister Michael Häupl wurde vom Gemeinderat zwar erneut in seinem Amt bestätigt, aber eine von vielen erwartete rot-schwarze Regierungszusammenarbeit kam nicht zustande.      
  |      |   
| 10., Laxenburger Straße, 2010 | 
|      |  
| 1, Franz-Josefs-Kai (Ship station Vienna / IBM Building), 2010 | 
   forms since a refurbishment a curved glass skin, the outer shell of the double façade of the IBM building (architect : George Lippert, year 1969).        
   from Roman times to the late 19th Century there were on the southern arm of the Danube, present-day Danube canal boat traffic. By regulation of the Danube near the city lost, natural watercourse its function as an important transport route, which he had occupied for many centuries. Since July 2010 create the new pier City all the pleasure boats of the DDSG Blue Danube, and the two Twin City Liner, since 2006 several times daily service between Vienna and Bratislava.   |    |  
| 2nd, Taborstraße | 
In the monochrome facade of the 75 m high Sofitel Vienna St. Stephen's Cathedral (architect Jean Nouvel, built in 2010), reflecting the Media Tower by Hans Hollein. The ceiling is a work of media artist Pipilotti Rist.
The showroom of a traditional watch shops in the vicinity of the clock museum adjacent to the Gothic choir of the church at the court. Also in the "cafe metropolis" Vienna, the trend is to a quick coffee to go "watch. How well the old coffeehouse literati would comment on this phenomenon?
|    |  
| 1., Schwarzenbergplatz, 2010 | 
|      |   
| 1., Schreyvogelgasse / Mölkerbastei, 2010 | 
|    |  
| 1st, Lorraine Street, 2010 | 
|    |  
| 22 ., Wagramer Strasse, 2010 | 
|      |   
| 22., Wagramer Straße, 2010 | 
|      |   
| 22., bei U2-Station Donaustadtbrücke, 2010 | 
Subscribe to:
Comments (Atom)